AMCC 3WARE 9590SE Guía de instalación Pagina 26

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 36
  • Tabla de contenidos
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 25
Chapter 2. Installing the Battery Backup Unit
22 3ware 9590SE Serial ATA RAID Controller Quick Install Guide
Tools and equipment required
Slot-head screwdriver
Grounding strap
Battery Backup Unit (BBU) and battery
3ware 9590SE series controller
Installation Overview
The Battery Backup Unit (BBU) is comprised of two pieces: the
battery module and the BBU control module.
These pieces attach to the controller at the points illustrated in
Figure 13 and 14:
a Clips on the battery module match to two slots on the top and
one hole in the middle of the 3ware 9590SE RAID controller.
b Connector on the BBU mates to receptacle on the controller.
c Post on the BBU mates to post hole on the controller.
Figure 13. Points of connection on the BBU
a) Clips
b) BBU connector
c) Post
Vista de pagina 25
1 2 ... 21 22 23 24 25 26 27 28 29 30 31 ... 35 36

Comentarios a estos manuales

Sin comentarios