AMCC 9000 Manual de usuario Pagina 110

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 126
  • Tabla de contenidos
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 109
Appendix A. Installing the Battery Backup Unit
102 3ware 9000 Series Serial ATA RAID Controller Installation Guide
Installation Instructions
1 For full-height controllers, turn the controller memory-side
down on a flat surface.
2 Remove the screws that connect the PCI bracket to the
controller and set the bracket aside.
Figure 4. Removing the screws from the PCI bracket
3 For full-height controllers, turn the controller memory side up.
Half-height board:
bracket unscrews from
top side of board.
Full-height board: bracket
unscrews from bottom side of
board.
Vista de pagina 109
1 2 ... 105 106 107 108 109 110 111 112 113 114 115 ... 125 126

Comentarios a estos manuales

Sin comentarios