AMCC 9000 Manual de usuario Pagina 116

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 126
  • Tabla de contenidos
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 115
Appendix A. Installing the Battery Backup Unit
108 3ware 9000 Series Serial ATA RAID Controller Installation Guide
3 Disconnect the battery power cable from the BBU.
To do so, press down on the lever-like clip on the battery power
connector and slide it out of the slot.
Figure 11. Power cable from the battery to the BBU
4 Slide the battery out of the plastic.
5 Insert the new battery and cable it up.
6 If necessary, reinstall the 3ware RAID controller, close up your
system and restart it.
7 Run a battery test to compute the estimated battery capacity of
this new battery.
You can run the battery test from the BBU page of either 3BM
or 3DM 2. For detailed instructions, see the 3ware 9000 Series
Serial ATA RAID Controller User Guide.
Vista de pagina 115
1 2 ... 111 112 113 114 115 116 117 118 119 120 121 ... 125 126

Comentarios a estos manuales

Sin comentarios