
Controller Object Commands
www.3ware.com 41
/c
x
show phy
This command is for the 9690SA only. It reports a list of the phys for the
controller.
Example of 9690SA-8E connected to drives in an enclosure:
Device --- Link Speed (Gbps) ---
Phy SAS Addesss Type Device Supported Enabled Limit
--------------------------------------------------------------------------
phy0 500050e000030232 ENCL N/A 1.5-3.0 3.0 Auto
phy1 500050e000030232 ENCL N/A 1.5-3.0 3.0 Auto
phy2 500050e000030232 ENCL N/A 1.5-3.0 3.0 Auto
phy3 500050e000030232 ENCL N/A 1.5-3.0 3.0 Auto
phy4 500050e000030236 ENCL N/A 1.5-3.0 3.0 Auto
phy5 500050e000030236 ENCL N/A 1.5-3.0 3.0 Auto
phy6 500050e000030236 ENCL N/A 1.5-3.0 3.0 Auto
phy7 500050e000030236 ENCL N/A 1.5-3.0 3.0 Auto
Example of 9690SA-8I with directly attached drives:
Device --- Link Speed (Gbps) ---
Phy SAS Addesss Type Device Supported Enabled Limit
--------------------------------------------------------------------------
phy0 500050e000030442 SAS 0 1.5-3.0 3.0 Auto
phy1 500050e000030442 SAS 2 1.5-3.0 3.0 Auto
phy2 500050e000030442 SAS 4 1.5-3.0 3.0 Auto
phy3 500050e000030442 SAS 6 1.5-3.0 3.0 Auto
phy4 500050e000030446 SAS 1 1.5-3.0 3.0 Auto
phy5 500050e000030446 SATA 3 1.5-3.0 1.5 Auto
phy6 500050e000030446 SATA 5 1.5-3.0 1.5 Auto
phy7 500050e000030446 SATA 7 1.5-3.0 3.0 Auto
/c
x
show rebuild
9000 series controllers support background tasks and allow you to schedule a
regular time when they occur.
Rebuild is one of the supported background tasks. Migrate and initialize are
other background tasks that follow the same schedule as rebuild. Other
background tasks for which there are separate schedules are verify and
selftest. For each background task, up to 7 time periods can be registered,
known as slots 1 through 7. Each task schedule can be managed by a set of
commands including add, del, show and set a task. Background task
schedules have a slot id, start-day-time, duration, and status attributes.
For details about setting up a schedule for background rebuild tasks, see
“Setting Up a Rebuild Schedule” on page 52.
Rebuild activity attempts to (re)synchronize all members of redundant units
such as RAID-1, RAID-10, RAID-5 and RAID-50. Rebuild can be started
manually or automatically if a spare has been defined. Scheduled rebuilds will
take place during the scheduled time slot, if enabled the schedules are
Comentarios a estos manuales